Building
pre-eminent vertically integrated Lithium business in Ontario, Canada

Strategy to become the first lithium concentrates and chemical producer in Ontario.

Green Technology Metals Limited (GT1) is an Australian company led by an experienced team with significant global lithium exploration and mining expertise. We are well positioned to become the first integrated Lithium chemical producer in the Ontario region.

Company

overview

22.5 Mt1

TOTAL JORC MINERAL RESOURCE ESTIMATE

1.14%

AVERAGE LI2O GRADE

10

LITHIUM PROJECT AREAS

56k Ha

560KM2 LAND HOLDING

2025

PLANNED FIRST SPODUMENE CONCENTRATE PRODUCTION

72%

SPODUMENE CONCENTRATE PRODUCED FROM INITIAL HLS TESTWORK FOR SEYMOUR WITH LITHIUM RECOVERY EXCEEDING 72%

Sustainable strategies for global projects

Our people at Green Technology Metals have extensive experience and proven track record of rapidly advancing and delivering lithium projects globally. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vestibulum vitae posuere nisl. Aenean dapibus metus elit, ac lacinia ligula varius eget.

Company Strategy - Building the supply chain

Staged development strategy featuring multiple mine and process hubs feeding a central lithium conversion facility.

Stage 1:

Spodumene Concentrate production 2025: Eastern Hub Seymour mine and Concentrator

Stage 2:

Lithium Hydroxide Production 2028: Conversion Facility, Thunder Bay

Stage 3:

Expansion 2029: Western Hub mine and Concentrator, Root Bay

Scroll to Top

Work Scope/Contract No 2 - Site access road maintenance includes

  • regular inspections and repairs of the Jack Fish road turn off to Seymour to ensure safe and reliable access for vehicles and equipment
  • upkeep of the Armstrong Accommodation Camp access and internal roads
  • grading, resurfacing, snow removal, and drainage management to prevent erosion and maintain road integrity
  • implementing safety and environmental compliance measures, scheduling routine maintenance, and providing progress reports to stakeholders

 The goal is to maintain optimal road conditions, minimize downtime, and ensure compliance with safety and environmental standards

 Procurement Strategy: Daily rate plus materials

Location: Seymour Mine Site

Equipment: Grader, water cart, drum compactor, snow plough, wheel loader, tipper truck, road sweeper

Likely team size: 2-4 staff on 2 x 2 roster (12-hour day shift)

Duration: 3 years minimum

Work Scope/Contract No 1 - Surface Crushing Plant and Operation for Seymour Mine construction

  • site preparation, supply and installation of crushing and screening equipment
  • establishing operational procedures for material handling and crushing operations to crush excavated waste rock to the appropriate sizes and specifications to serve as construction gravel
  • implementing safety and environmental compliance measures, scheduling regular maintenance, and monitoring systems to ensure optimal performance

The goal is to produce high-quality aggregate materials efficiently while adhering to safety, environmental, and quality standards, and providing regular progress reports to stakeholders

Procurement Strategy: Supply, Install and Operate

Location: Seymour Mine Site

Equipment: Surface Crushing Plant and Loader

Likely team size: 2-3 staff on 2 x 2 roster (12-hour day shift)

Duration: 12 months

Power Supply: by GT1

Feed rock hardness and size: TBA

Final screened product sizes: TBA