Projects / Eastern Hub

Junior Project

Ontario, Canada

The Junior project features three drill-ready LCT pegmatite occurrences: Despard, Tape and Swole and located within GT1's Eastern Hub, in close proximity to the proposed Seymour mine and concentrator

10,856 Ha

The Junior project is comprised of a large 10,856 hectares (108.56km2) land holding

4-9 MT

Successful field work has resulted in an initial exploration target of 4-9 million tonnes at 1-1.5% Li20 over the project

3 Target Areas

Despard, Swole and Tape featuring three drill-ready LCT pegmatite occurrences

20km from Seymour

Junior is located 20km from Seymour, any resource growth will play a critical role in delivering long term feed to the planned Seymour concentrator 

100% Owned

Purchased in October 2023

Underexplored

boasts proven grade and multiple occurrences, indicating the likelihood of stacked pegmatites or a potentially fertile intrusive system

Exploration

The Junior Project spans 10,856 hectares (108.5km2) and features three drill-ready LCT pegmatite occurrences: Despard, Tape and Swole. The project is located within the Eastern Hub, in close proximity to the proposed Seymour mine and concentrator and holds significant potential to secure additional feedstock and potentially contribute to extending the lifespan of the mine.

Successful field work has resulted in an initial exploration target of 4-9 million tonnes at 1-1.5% Li20 over the project
Located 20km from Seymour and shows strong grades and multiple occurrences, indicating possible stacked pegmatites or a larger intrusive system
8,100m maiden diamond drilling program set to commence after an archaeology survey is completed over the area
Resource growth will play a critical role in delivering long term feed to the planned Seymour concentrator
Field crews are now mobilised to the Swole target area, aiming to verify previous mapping and drilling completed by Landore in 2011

Despard Prospect

Located approximately 1km north of the east end of North Lamaune Lake, holding exposed outcrop and boulders.

Historic exploration at Despard is limited with a 10 hole diamond drilling program undertaken in 1959.

Scroll to Top

Work Scope/Contract No 2 - Site access road maintenance includes

  • regular inspections and repairs of the Jack Fish road turn off to Seymour to ensure safe and reliable access for vehicles and equipment
  • upkeep of the Armstrong Accommodation Camp access and internal roads
  • grading, resurfacing, snow removal, and drainage management to prevent erosion and maintain road integrity
  • implementing safety and environmental compliance measures, scheduling routine maintenance, and providing progress reports to stakeholders

 The goal is to maintain optimal road conditions, minimize downtime, and ensure compliance with safety and environmental standards

 Procurement Strategy: Daily rate plus materials

Location: Seymour Mine Site

Equipment: Grader, water cart, drum compactor, snow plough, wheel loader, tipper truck, road sweeper

Likely team size: 2-4 staff on 2 x 2 roster (12-hour day shift)

Duration: 3 years minimum

Work Scope/Contract No 1 - Surface Crushing Plant and Operation for Seymour Mine construction

  • site preparation, supply and installation of crushing and screening equipment
  • establishing operational procedures for material handling and crushing operations to crush excavated waste rock to the appropriate sizes and specifications to serve as construction gravel
  • implementing safety and environmental compliance measures, scheduling regular maintenance, and monitoring systems to ensure optimal performance

The goal is to produce high-quality aggregate materials efficiently while adhering to safety, environmental, and quality standards, and providing regular progress reports to stakeholders

Procurement Strategy: Supply, Install and Operate

Location: Seymour Mine Site

Equipment: Surface Crushing Plant and Loader

Likely team size: 2-3 staff on 2 x 2 roster (12-hour day shift)

Duration: 12 months

Power Supply: by GT1

Feed rock hardness and size: TBA

Final screened product sizes: TBA