top of page

NORTH AUBRY DEPOSIT EXTENDED DOWN DIP AND ALONG STRIKE




HIGHLIGHTS

  • Phase 1 drilling program at Seymour (expanded to 16 holes totalling 5,000m at North Aubry) now approximately 90% complete and ahead of schedule.

  • The North Aubry “Pegmatite” dimensions are currently 250m wide (strike) by 700m long (down dip) with a thick core ranging from 15m to 43m.

  • All completed holes have intersected pegmatite intervals (up to 43m thickness) located along strike and down dip of existing deposit boundaries.

  • Further thick, continuous, high-grade intercepts confirming mineralised continuity along strike and down dip; 8.9m at 1.46% Li2O (from 243m downhole; GTDD-21-0005).

  • Phase 2 diamond drill program (31-holes for 5,100m) set to commence shortly at the highly prospective and largely untested Central Aubry zone.


留言


Green-Technology-Metals-Black.png

CANADA

AUSTRALIA

+1 807 621 0854

Thunder Bay
160 Logan Avenue, Thunder Bay, Ontario P7A 6R1


Toronto

241 Yonge St,

Toronto,

Ontario M5B 1N8

+61 8 6557 6825

Perth
Level 1, 338 Barker Road

Subiaco WA 6008 Australia

b61c7e_e9e5992a0dd84feca144515f9dab5877_mv2.png

SUBSCRIBE

Sign up to receive Green Technology Metals news and updates.

bottom of page