Building the first integrated lithium business in Ontario, Canada

KEY HIGHLIGHTS

Key Announcement

26 March 2024

Increased Exploration Target & Drill Results at Root Project

Latest Presentation

5 March 2025

Investor Presentation - March 2025

Annual Report

30 September 2024

Annual Report to shareholders

Located on the doorstep of the North American Lithium supply chain

Green Technology Metals Limited (GT1) is a North American-focused lithium exploration and development company, stands as one of the most advanced lithium explorers in the Ontario region.

Guided by a strategic vision, GT1 aims to establish itself as the premier producer of lithium concentrates and chemicals in the province, with robust support from tier-one strategic partners such as LG Energy Solution, AMCI Group, and Lithium Americas Corp.

Key statistics

24.9 Mt

Global JORC Mineral Resource update

1.13%

Average Li20 Grade

C$100m LOI

secured from Export Development Canada (EDC) for the Development of the Seymour Project

Strategic Partnerships

Industry leading strategic Partnerships with EcoPro Innovation and LG Energy Solution

Low Risk

Operating in Canada, ranked globally as the lowest risk mining jurisdiction  

Our Projects

Seymour Lithium Project

Stage 1

Lithium Conversion Facility

Stage 2

Root Lithium Project

Stage 3

Company Strategy - Building the supply chain

Development of a regional supply chain with multiple mine and process hubs feeding a central lithium conversion facility.

Scroll to Top

Work Scope/Contract No 2 - Site access road maintenance includes

  • regular inspections and repairs of the Jack Fish road turn off to Seymour to ensure safe and reliable access for vehicles and equipment
  • upkeep of the Armstrong Accommodation Camp access and internal roads
  • grading, resurfacing, snow removal, and drainage management to prevent erosion and maintain road integrity
  • implementing safety and environmental compliance measures, scheduling routine maintenance, and providing progress reports to stakeholders

 The goal is to maintain optimal road conditions, minimize downtime, and ensure compliance with safety and environmental standards

 Procurement Strategy: Daily rate plus materials

Location: Seymour Mine Site

Equipment: Grader, water cart, drum compactor, snow plough, wheel loader, tipper truck, road sweeper

Likely team size: 2-4 staff on 2 x 2 roster (12-hour day shift)

Duration: 3 years minimum

Work Scope/Contract No 1 - Surface Crushing Plant and Operation for Seymour Mine construction

  • site preparation, supply and installation of crushing and screening equipment
  • establishing operational procedures for material handling and crushing operations to crush excavated waste rock to the appropriate sizes and specifications to serve as construction gravel
  • implementing safety and environmental compliance measures, scheduling regular maintenance, and monitoring systems to ensure optimal performance

The goal is to produce high-quality aggregate materials efficiently while adhering to safety, environmental, and quality standards, and providing regular progress reports to stakeholders

Procurement Strategy: Supply, Install and Operate

Location: Seymour Mine Site

Equipment: Surface Crushing Plant and Loader

Likely team size: 2-3 staff on 2 x 2 roster (12-hour day shift)

Duration: 12 months

Power Supply: by GT1

Feed rock hardness and size: TBA

Final screened product sizes: TBA