top of page

DRILLING COMMENCES AT SECOND KEY LITHIUM PROJECT IN ONTARIO



HIGHLIGHTS

  • Phase 1 diamond drilling has commenced at the McCombe LCT pegmatites (Root Project).

  • Initial 22-hole, 2,500m program set to confirm McCombe historical drilling and sampling results.

  • Phase 2 diamond drilling to target significant expansion of the known McCombe mineralisation.

  • Historical drilling demonstrated down-dip continuity at McCombe (including 67m @ 1.75% Li20).

  • Total 24,000m diamond drilling program initially planned over McCombe and Morrison pegmatites.

  • Targeting rapid delineation of a maiden Mineral Resource estimate for the Root Project.

  • Drilling continues in parallel at Seymour with two drill rigs operating



“Commencing drilling at Root is another significant milestone for our business. The initial focus at the advanced McCombe LCT pegmatite is confirmation and extension of known mineralisation, followed by rapid estimation of a maiden Mineral Resource estimate. We then plan to target other known spodumene-bearing LCT pegmatites at Root, including Morrison and Root Bay.”


Luke Cox

GT1 Chief Executive Officer





Green-Technology-Metals-Black.png

CANADA

AUSTRALIA

+1 807 621 0854

Thunder Bay
160 Logan Avenue, Thunder Bay, Ontario P7A 6R1


Toronto

241 Yonge St,

Toronto,

Ontario M5B 1N8

+61 8 6557 6825

Perth
Level 1, 338 Barker Road

Subiaco WA 6008 Australia

b61c7e_e9e5992a0dd84feca144515f9dab5877_mv2.png

SUBSCRIBE

Sign up to receive Green Technology Metals news and updates.

bottom of page